Northpower safe, reliable, hassle free service.

Bookmark and Share

Travelling with High Loads

You must apply for a High Load Permit if you plan to move any tall structure such as a house or a boat. For more information visit Escourting High Loads under Network Services or call Northpower Faults on 0800 10 40 40, or complete the High Load Application Form and fax it to us. Allow two to five working days for permit processing.

Loads between 4.75 and 5.4 metres high:

  • We will check the proposed route.
    If the route is clear to the height required, a permit will be issued.
    If there are low lines we will arrange to escort the load at no cost.

Loads 5.4 metres high and over:

  • We will check the proposed route.
  • If the route is clear to the height required, a permit will be issued.
  • If the route is not clear we will arrange an escort. A charge will apply.
  • If disconnection is necessary, a 15 day notice period is required so we can inform customers who will be affected.

 

Related Downloads

Did you know?

Our most skilled Line Mechanics can work on live lines up to 33,000 volts. They wear gloves that are insulated to 40,000 volts.

Terms & Conditions Terms of Use Site Information Sitemap