Non-domestic Line Charges for non-half-hour metering on the Northpower network (excluding GST)
Effective 1st April 2011

Plan No.Energised ICP’s at 01/04/11Price PlanApplicable charges excluding meteringTariff CodeAvailability per dayTotal line charge from 1/04/10Total line charge from 1/04/11 Transmission portion of total line charge from 1/04/2011
ND1 9,223 NON - DOMESTIC Standard daily charge A   25.00 30.00 cents/day 0%
    (100A or less) Non-domestic 24 hour 33 24 hours 10.05 10.45 cents/unit 22%
      Priority controlled 05 22 hours 5.00 5.20 cents/unit 27%
      Non-domestic 18 hour 46 18 hours 3.50 3.60 cents/unit 25%
      Non-domestic night rate boosted (Closed tariff) 57 2300-0700
+1200-1500
3.50 3.60 cents/unit 17%
      Non-domestic night rate 47 2300-0700 0.90 0.95 cents/unit 21%
      Metered lighting 19 Dusk to dawn 7.85 8.20 cents/unit 29%
      Unmetered lighting 24 Dusk to dawn 7.85 8.20 cents/unit 29%
      Exported generation 93   0 0 cents/unit 0%
                   
ND2 311 LARGE COMMERCIAL Large Comm daily charge B   105.00 110.00 cents/day 0%
    (with CT metering) Large Commercial 24 hour 32 24 hours 9.35 9.75 cents/unit 24%
      Priority controlled rate 55 22 hours 5.00 5.20 cents/unit 27%
      Non-domestic 18 hour 46 18 hours   3.60 cents/unit 25%
      Non-domestic night rate 47 2300-0700 0.90 0.95 cents/unit 21%
                   
ND4 40 SCHOOL DAY/NIGHT Standard daily charge S   25.00 30.00 cents/day 0%
      School day 34 0700-2300 10.05 10.45 cents/unit 22%
      School night 35 2300-0700 2.60 2.70 cents/unit 7%
      Priority controlled 05 22 hours 5.00 5.20 cents/unit 27%
                   
ND5 92 CONTROLLED DAY/NIGHT Standard daily charge P   25.00 30.00 cents/day 0%
      Controlled day 11 0700-2300* 5.90 6.15 cents/unit 23%
      Controlled night 12 2300-0700* 2.60 2.70 cents/unit 7%
      Non-domestic 24 hour 33 24 hours 10.05 10.45 cents/unit 22%
      Priority controlled 05 22 hours 5.00 5.20 cents/unit 27%
        * Tariff Code 11/12 is subject to control as per Tariff Code 05
ND6 235 UNMETERED 24 HOUR Daily charge per ICP G   25.00 30.00 cents/day 0%
      Unmetered  24 hour 25 24 hours 10.05 10.45 cents/unit 22%
                   
ND7 21 UNMETERED Daily charge per fitting H   7.00 8.00 cents/day 0%
    PUBLIC LIGHTING Unmetered lighting 24 Dusk to dawn 7.85 8.20 cents/unit 29%
                   
ND11 0 METERED 24 HOUR Standard daily charge A   25.00 30.00 cents/day 0%
    (CABINETS) Metered 24 hour 43 24 hours 10.05 10.45 cents/unit 22%
                   
ND12 295 BUILDERS TEMP BTS daily charge T   50.00 60.00 cents/day 0%
      BTS 24 hour 53 24 hours 10.05 10.45 cents/unit 22%
                   
ND13 N/A LONG TERM D/C Daily charge per ICP L   0 0 cents/day 0%

ND4 Price Plan (School Day/Night) is applicable to educational institutions where the winter night load is predominately attributable to night-store heaters with approved control.

Controlled 18-hour and 22-hour line charges apply where Northpower determines the on/off times to manage peak loads.  Where other parties determine the control times, line charges will revert to the applicable 24-hour rates.

Builders Temporary Supplies (ND12 Price Plan) may only be used for the purpose of providing a temporary electricity supply to an active construction worksite.  It may remain connected for a period of up to two years.  Inspection and re-certification by a Northpower inspector, at a fee chargeable to the applicant, could extend the initial period by two years. Connections classified as Builders Temporary Supplies cannot transfer to other Price Plans until the permanent supply has been inspected and signed off by a Northpower inspector. Expiry of certification or breach of usage restrictions may result in disconnection of supply.

ICP’s with Advanced Metering will remain on the ND1, ND2, ND4, ND5 and ND12 Price Plans provided the retailer (or the data agent) supplies normalised “as-billed” consumption data files to Northpower in EIEP1 format for line charge billing purposes.  If half-hour data is provided instead of normalised consumption data, those ICP’s with transfer to price plan ND10 (in Table 3) which is the price-plan for sites with half-hour metering.

ICP’s will be transferred to the Long Term De-energised Price plan (ND13) when the meters have been removed and the serviceline has been completely disconnected at the Network Connection Point but permission has not been obtained to permanently dismantle the supply in accordance with Subpart 3 of Part 4 of the Electricity Industry Act 2010.  ICP’s on the ND13 Price Plan can not transfer to other Price Plans until the serviceline meets Northpower’s standard requirements and a CoC for the installation has been sighted by Northpower.

Power factor requirements for ND1 to ND5 plans
From 1 April 2012, the power factor requirement and the threshold for charges for excess reactive power will increase from 0.95 to 0.96.
From 1 April 2013, the power factor requirement and the threshold for charges for excess reactive power may increase from 0.96 to 0.97.