Northpower safe, reliable, hassle free service.

Bookmark and Share

Large Commercial

Line Charges for Commercial & Industrial sites with half-hour metering on the Northpower network (excluding GST)
Effective 1st April 2011

Price PlanApplicable charges excluding meteringTariff CodeAvailability per dayTotal line charge from 1/04/10Total line charge from 1/04/11 Transmission portion of total line charge from 1/04/2011
ND9 (Code 9) Monthly Customer charge D 24 hours $113.00 $113.00 $/month 0%
Demand-based Anytime Demand Charge 09AD   $5.25 $5.40 $/kVA/month 43%
(68 ICP’s) Shoulder Demand Charge 09SD   $6.90 $7.05 $/kVA/month 55%
  Reactive Power charge 09RP   $2.41 $2.41 $/excess kVAr/month 100%
               
ND10 (Code 10) Daily Customer charge J 24 hours 244.00 244.00 cents/day 0%
Consumption HH commercial 31   9.05 9.45 cents/unit 25%
        based Reactive Power charge 31RP   3.00 3.00 cents/excess kVArh 100%
(68 ICP’s)              

Methodology for ND9 “Code 9” charges

  • The Anytime Demand is the highest half-hour demand at any time between 1 April and 31 March, with a minimum chargeable demand of 150kVA.
  • The Shoulder Demand is the average of the six highest daily half-hour demands from 0700-1000 and 1700-2130 from May to September with a minimum chargeable demand of 150kVA.
  • Both the Anytime and Shoulder Demand Charges are charged in every month.
  • The Reactive Power Charge is assessed on the basis of a 0.95 lagging power factor coincident with the highest half-hour demand each month.

Methodology for ND10 “Code 10” charges

  • The ND10 Price Plan is an alternative for ICP’s with half-hour metering where the ND9 Price Plan is unsuitable.
  • The Reactive Power Charge is assessed on the basis of an average 0.95 power factor over an entire month.

Power factor requirements for ND9 and ND10 plans
From 1 April 2012, the power factor requirement and the threshold for charges for excess reactive power will increase from 0.95 to 0.96.
From 1 April 2013, the power factor requirement and the threshold for charges for excess reactive power may increase from 0.96 to 0.97.
From 1 April 2014, the pwer factor requirement and the threshold for charges for excess reactive power may increase from 0.97 to 0.98.

Note:  ND 9 and ND10 are only available at ICP’s with half-hour metering.  Switches to or from ND9 and ND10 can only be made on the first day of a month.

Terms & Conditions Terms of Use Site Information Sitemap